fatride
08-30-2004, 10:38 PM
The thrash is on, MSD distributor in, valve springs shimmed, braided fuel line complete, 3/8" sending unit in, aluminum radiator installed, Mallory fuel pressure regulator hooked up, tranny fluid and filter change complete, super servo in, new CD unit and coil. I'd like to install my electric fuel pump and new filter but I don't think I'll have time. All that's left is the air bags. I figure that will be an all day job! Sure would like to get some DOT radial street slicks but cost may keep me away for now. Maybe with the air bags I can hook up better! Right now , hammer to the floor, wild tire spin through two gears then hooks up in third. :dunno , lots of power , hope to get into the 13s! :eek: