Hi Guys, Here is another instalment on my '57 "W"build.
1 Driveshaft gets the treatment.Sandblast/prime & paint along with front yoke for TH-350 trans.
2 Yoke checks out good,
3 New U-joints waiting to install. Notice 1 ujoint ready to explode !
4 All done !
5 Fender tie bar/Rad support tie bar blasted & primed.
6 6 cylinder rad support ready for the treatment.
7 Straightened & primed.
8 All done waiting to get installed.
9 Hearst 3" drop drag link from Speedway will replace stock drag link (WAY TOO CLOSE TO OIL PAN )
10 All new guts. This was installed in conjunction with a power steering Pitman arm and Idler arm. This gave me about 1 inch of clearance on the pan. Still not good enough for me. Pinto Rack & Pinion in my plans.
11 Adapter for Edelbrock Durashine 600 carb.
12 Carb is mounted and looking good.
13 Temporary rubber fuel line until I get the final steel line
14 THE OTHER EYE CANDY !!!
15 Radiator support installed. Now to get to the rest of the front end sheetmetal.
More to come.
1 Driveshaft gets the treatment.Sandblast/prime & paint along with front yoke for TH-350 trans.
2 Yoke checks out good,
3 New U-joints waiting to install. Notice 1 ujoint ready to explode !
4 All done !
5 Fender tie bar/Rad support tie bar blasted & primed.
6 6 cylinder rad support ready for the treatment.
7 Straightened & primed.
8 All done waiting to get installed.
9 Hearst 3" drop drag link from Speedway will replace stock drag link (WAY TOO CLOSE TO OIL PAN )
10 All new guts. This was installed in conjunction with a power steering Pitman arm and Idler arm. This gave me about 1 inch of clearance on the pan. Still not good enough for me. Pinto Rack & Pinion in my plans.
11 Adapter for Edelbrock Durashine 600 carb.
12 Carb is mounted and looking good.
13 Temporary rubber fuel line until I get the final steel line
14 THE OTHER EYE CANDY !!!
15 Radiator support installed. Now to get to the rest of the front end sheetmetal.
More to come.