Lots more progress. The clutch linkage is all my in and adjusted the brakes are all hooked up again. Left inner fender is back in and it took a little trimming to fit around the Wilson headers I’m using. Got the ignition system all wired in, alternator is wired. Leak tested my fuel tank and all is good so that is installed, regulator mounted, fuel pump mount made and pump mounted, boost gauge all mounted, plumbed, and wired. Throttle linkage is all set. I got the accelerator pump seals from MRHP today and got them all installed so the carbs are mounted for the final time. Cooling system is all plumbed in and ready also. I had forgot to order the fuel pump inlet fitting but that should be here tomorrow. I had the helper checking things over to make sure it was done properly.