Phase 1 of Operation Bias Ply was completed Saturday.
Went down and took the wheels off and ran them to the local tire guy and had the tires dismounted. Thanks to Rusty we've got 5 new reproduction bias ply Goodyear 8.00 x 14 - 1" whitewalls ready to go back on.
Brought the wheels back and cleaned them up and blew some black paint on them as they should have been from the factory. Letting the paint cure a bit and will go back down in another week or two to get the new tires mounted.
Had a chance to get a warranty replacement battery taken care of as well and started up the car and let it run a bit.